EXTENSION OF REHAB SUBSTATION :
1- | RURAL ELECTRIFICATION –WESTBANK(PALESTINE) | 2 YEARS | COMPLETE INSTALLATION WORKS FOR 39 VILLAGES 33 & 11 KV & LV DISTRIBUTION NETWORK. |
2- | JERUSALEMELECT. DIST. CO. | 1 YEAR | TURNKEY 12 S/S 33/11 KV |
3- | TABAQAT FAHEL PROJECT | EDCO | 2000-2001 | - COMPLETE ELECTRICAL WORKS FOR (4) OUTDOOR 33KV SWITCHGWEAR SUBSTATIONS. -COMPLETE TESTING AND COMMISSIONING FOR THE FOUR SUBSTATIONS. |
4- | MUTAH UNIVERSITY 33/11 KV. SUBSTATION | MUTAH UNIVERSITY | 1998-1999 | SUPPLY, INSTALLATION, AND TESTING AND COMMISSIONING FOR AMODIFICATION OF 33/11 KV SUBSTATION. THE WORKS INCLUDE:- SUPPLY AND INSTALLATION BATTERY CHARGER 48VDC. - SUPPLY AND INSTALLATION BATTERY CHARGER 24 VDC. - SUPPLY AND INSTALLATION OF INDOOR AND OUTDOOR C.T’s. - SUPPLY AND INSTALLATION OF METERING AND PROTECTION RELAYS(SEPAM SERIES). - REMOVE ALL THE CONTROL CONNECTIONS AND REINSTALL NEW CONNECTIONS IN NEW CONFIGURATION. - RECONNECT CONTROL CONNECTIONS BETWEEN SWITCHGEAR AND GENERATOR SETS. - PROVIDE AS BUILT DRAWING FOR ALL ELECTRICAL WORKS. |
5- | PLG – UPGRADING TENDER 34/97 | CEMENT FACTORY | 1997-1998 | INSTALLATION TESTING AND COMMISSIONING OF THE FOLLOWING:· -PLC SYSTEM – 4000 POINT· -MCC’S AND MV SWITCHGEAR· -POWER TRANSFORMER· -FREQUENCY DRIVE· -LOCAL PANELS, CABLE TRAYS, CONDUITS· -MV AND LV CABLES· -CONTROL SYSTEM COMPONENTS ( LCB’S, CDB’S , LS, …Etc) · -INSTALLATION OF CONTROL SYSTEM I/O PC 65 AND REMONTE I/O’S PC 62,PC 63· -INSTALLATION OF INSTRUMENT DEVICES (IDB’S,SS,TS,PS,PO2.S,VIB,..ETC). ASSOCIATED WITH CABLE TERMINATION , TESTING AND COMMISSIONING |
6- | ARAB POTACH COMPANY CONTRACT 71/94 “NEW BRINE INTAKE PUMPING STATION | ARAB POTASH CO. | JUNE 1997 | SUBCONTRACTOR TO CEGELEC (EQUIPMENT SUPPLIER) FOR THE INSTALLATION OF ELECTRICAL WORKS. THE PROJECT CONSISTS MAINLY OF 4PUMPS, OF 2900 kW INSTALLED CAPACITY, COMPLETE WITH ALL ASSOCIATED ELECTRICAL & INSTRUMENTS EQUIPMENT.EMC SCOPE OF WORK INCLUDED BUT NOT LIMITED TO THE INSTALLATION, TESTING & COMMISSION OF THE FOLLOWIN:· -15 MVA, 33 kV/6.0 kV POWER TRANSFORMERS.· -1 NO, INDOOR 33 kV SWITCHBOARD· -5 CUBICLES OF 6.6 kV METAL CLAD SWITCHGEAR· -ALL CABLE LADDERS/TRAYS WORK· -5000M OF MV CABLES.· -LV & CONTROL DESKS · -ALL ASSOCIATED CONTROL & INSTRUMENTATION EQUIPMENT.· -LV MCC’S & CONTROL DESKS· -LV DISTRIBUTION SYSTEM, LIGHTING AND SMALL POWER DEVICES. |
7- | ARAB POTASH EXPANSION PROJECT | ARAB POTASH | 1993-1994 | SUBCONTRACTOR TO MERLIN GERIN ( EQUIPMENT SUPPLIER) TO WIMPEY & AIRMECH FOR INSTALLATION TESTING AND COMMISSIONING THE FOLLOWINGS:- -29 CELLS OF 11 kV METAL CLAD INDOOR SF6 SWITCHGEAR ( TESTING , TERMINATION & COMMISSIONING)- -6 CUBICLE OF 33 kV SWITCHBOARD ( EXTENSION TO THE EXISTING - 3.3 kV MOTOR CONTROL CENTERS (ABOUT 13 CUBICLES). (TESTING, TERMINATION & COMMISSIONING). - 33 kV , 11 kV & LV CABLES ( IN ASSOCIATION WITH WIMPEY) - 15 kV CABLE JOINTS & TERMINATION OF HARVESTERS CABLES, ON SEA WATER FLOATING LINE. - CABLE TRAYS AND LADDERS .- 15 KM of 33 kV OVER HEAD LINE. |
8- | MV DISTRIBUTION PROJECT | JORDAN ELECTRIC POWER CO. | 4 MONTHS1992 | ERECTION, TESTING COMMISSIONING AND MAINTENANCE OF ALL ASSOCIATED ELECTRICALWORK.THE WORK INCLUDED THE FOLLOWING: -20 NO’S 1000 KVA PAD MOUNTED PACKAGED SUBSTATIONS. -10 NO’S 1500 KVA PAD MOUNTED PACKAGED SUBSTATIONS. |
9- | REHABILITATION OF MV DISTRIBUTION NETWORK AT Q.A.I AIR PORT | CIVIL AVIATION AUTHORITY | 6 MONTHS 1989 | SUPPLY, INSTALLATION TESTING & COMMISSIONING OF 21 KM MV UNDER GROUND CABLES AT QUEEN ALIA INTERNATIONAL AIR-PORT FOR REHABILITATION OF THE DISTRIBUTION NETWORK.SUPPLY INSTALL TEST & COMMISSIONEING OF 4 PACKAGE SUBSTATIONS. |
10- | ARAB DRIP CO. | ARAB DRIP CO. | 8Weeks 1986 | DESIGN SUPPLY, INSTALLATION, TESTING & COMMISSIONING OF ALL ELECTRICAL WORKS COMPRISING · *NEW MAIN DISTRIBUTION BOARDS.· *MANUAL CHANGE OVER SWITCHES.· *CABLE TRAYS, LADDERS AND CABLES TO PRODUCTION LINE EQUIPMENT AND TO THREE ELECTRICAL EQUIPMENT.· *INSTALLATION OF PRODUCTION EQUIPMENT AS - MOULDING MACHINES - EXTRUDERS - AIR COMPRESSORS… ETC.· *EARTHING SYSTEM.· *TESTING & COMMISSIONING. |
11- | QUEEN ALIA INTERNATIONAL AIR PORT | CIVIL AVIATION AUTHORITY | 1980-1982 | INSTALLATION TESTING & COMMISSIONING OF: · MV SWITCH BOARDS (33 KV & 11 KV). -RING MAIN UNITS (11 KV) · -300 KM OF AIRFIELD CABLES (POWER & COMMUNICATIONS).· -DIESEL ENGINES GENERATING SETS.· -TRANSMISSION LINES.· -AIR FIELD LIGHTING TOWERS AND STREET LIGHTING.· -ALL NECESSARY AUXILIARY CONTROL EQUIPMENT - NAVIGATION SYSTEM· -CABLES TERMINATION AND INTERCONNECTION · -UPS & BATTERY CHARGERS.· -EARTHING SYSTEM. |
12- | WADI AL– YUTUM PUMPING STATION | WATER SUPPLY CORPORATION | 6 Month 1979 | SUPPLY, INSTALL TEST & COMMISSION OF COMPLETE ELECTRICAL WORKS FOR 7 PUMPING STATIONS INCLUDING DIESEL- GENERATOR SETSTHE WORK INCLUDED BUT NOT LIMITED TO THE FOLLOWING:· MAIN 33/0.4 kV SUBSTATION WITH ALL POWER & CONTROL EQUIPMENT.· 7 PUMPING STATION, 100 KVA EACH WITH MOTOR CONTROL CENTERS AND CONTROL EQUIPMENT.· ALL PUMPS AND PIPE WORKS · MV & LV DISTRIBUTION CABLES· MV O.H.L WETWORKS· ALL INSTRUMENTS AND INSSTRUMENTATION WORKS. |
13- | IRBID MAIN SUBSTATION (230/122/33 kV) | JORDAN ELECTRICITY AUTHORITY | 1977-1979 | INSTALLATION OF THE FOLLOWING:· -BUS WORKS· -132/230 kV OIL CIRCUIT BREAKER ( OUTDOOR)· -STEEL STRUCTURES· -ALL MV & LV CABLES, TRENCHES, TRAY AND LADDER SYSTEMS.· -ALL INDOOR RELAY & CONTROL PANELS.· -PROTECTION & CONTROL EQUIPMENT · -INDOOR METAL CLAD SWITCHGEARS · -EARTHING SYSTEM. THIS PROJECT IS REGISTERED AS ONE OF THE LARGEST SIMILAR ELECTRICAL PROJECT CONDUCTED BY LOCAL SUBCONTRACTOR SINCE 1979. |